A bespoke 78 kWp solar installation with projected long-term savings and an estimated four-to-five-year payback.

A bespoke 78 kWp solar installation with projected long-term savings and an estimated four-to-five-year payback.

A bespoke 78 kWp solar installation with projected long-term savings and an estimated four-to-five-year payback.

LIFETIME SAVINGS

+£642,030

+£642,030

+£642,030

Projected over 25 years

INSTALLED SOLAR SYSTEM

78 kWp

78 kWp

78 kWp

Installed photovoltaic capacity

PROJECT LOCATION

Sittingbourne / Kent

Sittingbourne / Kent

Sittingbourne / Kent

Commercial renewable energy project

REAL PROJECT / MEASURABLE RESULTS

COMMERCIAL SOLAR / THE RETURN

See how the savings add up.

See how the savings add up.

See how the savings add up.

A clearer view of the potential long-term financial impact of this solar installation.

A clearer view of the potential long-term financial impact of this solar installation.

A clearer view of the potential long-term financial impact of this solar installation.

PROJECTED 25-YEAR SAVINGS

+£642,030

+£642,030

+£642,030

Based on the existing project lifetime savings estimate.

ILLUSTRATIVE CUMULATIVE SAVINGS

ILLUSTRATIVE CUMULATIVE SAVINGS

25 YEARS

25 YEARS

£128k

£128k

£257k

£257k

£385k

£385k

£514k

£514k

£642k

£642k

YEAR 05

YEAR 05

YEAR 10

YEAR 10

YEAR 15

YEAR 15

YEAR 20

YEAR 20

YEAR 25

YEAR 25

Illustrative straight-line distribution of the 25-year projected total. Actual annual savings will vary.

Illustrative straight-line distribution of the 25-year projected total. Actual annual savings will vary.

SYSTEM / INSTALLED ON SITE

A system built for dependable output.

The system comprises 178 Jinko Tiger Neo 440 W N-type all-black mono solar panels designed to collect sunlight and convert it into DC electricity. These panels are connected to a SolaX X3 G4 15.0 FIT AC inverter and a SolarEdge Synergy 90 kW three-phase inverter, which convert the DC electricity into mains AC electricity. A SolaX Triple 5.8 kWh LFP battery storage system stores excess energy generated on sunny days for use at night. The system also includes the necessary isolators, wiring and meters required for a safe electrical connection.

PERFORMANCE / SITE CONDITIONS

Performance that accounts for the real site.

Over its projected 25-year lifetime, Hengistfield’s solar array is expected to prevent more than 3,800 tonnes of CO₂ emissions, comparable to taking nearly 820 petrol cars off the road. The carbon-offset impact is equivalent to over 16,000 mature trees, supporting cleaner air and healthier communities.

READY WHEN YOU ARE

Let’s build a smarter, more sustainable business.

Tell us what you’re working with and we’ll show you what your site could do.

Get a solar assessment

Pink Renewables

Commercial solar systems for a lower-carbon future.

Find us

Passion House, Excalibur Road, Beacon Park, Gorleston, Norfolk, NR31 7BB, United Kingdom

0800 043 6000 · hello@pinkrenewables.co.uk · Norfolk + UK wide

0800 043 6000 · hello@pinkrenewables.co.uk · Norfolk + UK wide

© 2026 Pink Renewables. Pink Renewables is a trading name of Pink Group Holdings Ltd, registered in England and Wales (company no. 07448391). Registered office: Passion House, Excalibur Road, Gorleston, Norfolk NR31 7BB.

Website built by

Navigate