
COMMERCIAL SOLAR / CASE STUDY
Great Yarmouth / Norfolk
LIFETIME SAVINGS
Projected over 25 years
INSTALLED SOLAR SYSTEM
Installed photovoltaic capacity
PROJECT LOCATION
Commercial renewable energy project
COMMERCIAL SOLAR / THE RETURN
PROJECTED 25-YEAR SAVINGS
Based on the existing project lifetime savings estimate.

SYSTEM / INSTALLED ON SITE
A system built for dependable output.
The system uses 252 Jinko Tiger Neo 440W N-type all-black mono solar panels, fixed to the factory’s trapezoidal metal roof with the K2 metal roof mounting system. The panels feed a single SolarEdge Synergy 90 kW three-phase inverter, with 126 SolarEdge S1000 power optimisers giving panel-level performance and monitoring. A generation meter and a SolarEdge energy meter track what the array produces and how much of it the site uses. All isolators, wiring and the safe connection to the site’s electrical system are included, with installation and certification carried out by a trained team.
PERFORMANCE / SITE CONDITIONS
Performance that accounts for the real site.
The roof faces 12° from due south at a 16° pitch, with no shading from nearby buildings or trees, giving the array an estimated output of 100,122 kWh a year. Around 83,080 kWh of that is expected to be used directly by the factory, covering roughly 29% of its 290,081 kWh annual demand and saving around £13,293 a year on electricity. The remaining 17,031 kWh will be exported to the grid, earning around £1,362 a year through the Smart Export Guarantee. Together, the system is expected to save 20,730 kg of CO₂ every year, the same amount absorbed by 951 trees.

MORE PROJECTS
Care homes and commercial sites across the South East, now generating their own clean power. Savings shown are 25-year projections.

01
TE Connectivity
Great Yarmouth / Norfolk
25-YEAR SAVINGS
+£384,218
SYSTEM
110.88 kWp

02
Lulworth Care Home
Maidstone / Kent
25-YEAR SAVINGS
+£268,887
SYSTEM
38.72 kWp

03
Hengistfield
Sittingbourne / Kent
25-YEAR SAVINGS
+£642,030
SYSTEM
78 kWp

04
Sonya Lodge
Willingham / Kent
25-YEAR SAVINGS
+£314,224
SYSTEM
41.36 kWp

05
St Winifreds
Deal / Kent
25-YEAR SAVINGS
+£296,243
SYSTEM
53.68 kWp

06
Meyer House
Erith / Kent
25-YEAR SAVINGS
+£479,261
SYSTEM
64.24 kWp
READY WHEN YOU ARE
Let’s build a smarter, more sustainable business.
Tell us what you’re working with and we’ll show you what your site could do.
Get a solar assessment

Commercial solar systems for a lower-carbon future.
Find us
Passion House, Excalibur Road, Beacon Park, Gorleston, Norfolk, NR31 7BB, United Kingdom
© 2026 Pink Renewables. Pink Renewables is a trading name of Pink Group Holdings Ltd, registered in England and Wales (company no. 07448391). Registered office: Passion House, Excalibur Road, Gorleston, Norfolk NR31 7BB.
