Close-up of a solar panel surface in warm light

COMMERCIAL SOLAR / CASE STUDY

Great Yarmouth / Norfolk

TE Connectivity

TE Connectivity

TE Connectivity

A 110.88 kWp rooftop system modelled to generate 100,122 kWh a year, with an expected five-year payback.

A 110.88 kWp rooftop system modelled to generate 100,122 kWh a year, with an expected five-year payback.

A 110.88 kWp rooftop system modelled to generate 100,122 kWh a year, with an expected five-year payback.

LIFETIME SAVINGS

+£384,218

+£384,218

+£384,218

Projected over 25 years

INSTALLED SOLAR SYSTEM

110.88 kWp

110.88 kWp

110.88 kWp

Installed photovoltaic capacity

PROJECT LOCATION

Great Yarmouth / Norfolk

Great Yarmouth / Norfolk

Great Yarmouth / Norfolk

Commercial renewable energy project

REAL PROJECT / MEASURABLE RESULTS

COMMERCIAL SOLAR / THE RETURN

See how the savings add up.

See how the savings add up.

See how the savings add up.

A clearer view of the potential long-term financial impact of this solar installation.

A clearer view of the potential long-term financial impact of this solar installation.

A clearer view of the potential long-term financial impact of this solar installation.

PROJECTED 25-YEAR SAVINGS

+£384,218

+£384,218

+£384,218

Based on the existing project lifetime savings estimate.

ILLUSTRATIVE CUMULATIVE SAVINGS

ILLUSTRATIVE CUMULATIVE SAVINGS

25 YEARS

25 YEARS

£77k

£77k

£154k

£154k

£231k

£231k

£307k

£307k

£384k

£384k

YEAR 05

YEAR 05

YEAR 10

YEAR 10

YEAR 15

YEAR 15

YEAR 20

YEAR 20

YEAR 25

YEAR 25

Illustrative straight-line distribution of the 25-year projected total. Actual annual savings will vary.

Illustrative straight-line distribution of the 25-year projected total. Actual annual savings will vary.

Aerial view of the TE Connectivity factory roof with the solar array layout highlighted

SYSTEM / INSTALLED ON SITE

A system built for dependable output.

The system uses 252 Jinko Tiger Neo 440W N-type all-black mono solar panels, fixed to the factory’s trapezoidal metal roof with the K2 metal roof mounting system. The panels feed a single SolarEdge Synergy 90 kW three-phase inverter, with 126 SolarEdge S1000 power optimisers giving panel-level performance and monitoring. A generation meter and a SolarEdge energy meter track what the array produces and how much of it the site uses. All isolators, wiring and the safe connection to the site’s electrical system are included, with installation and certification carried out by a trained team.

PERFORMANCE / SITE CONDITIONS

Performance that accounts for the real site.

The roof faces 12° from due south at a 16° pitch, with no shading from nearby buildings or trees, giving the array an estimated output of 100,122 kWh a year. Around 83,080 kWh of that is expected to be used directly by the factory, covering roughly 29% of its 290,081 kWh annual demand and saving around £13,293 a year on electricity. The remaining 17,031 kWh will be exported to the grid, earning around £1,362 a year through the Smart Export Guarantee. Together, the system is expected to save 20,730 kg of CO₂ every year, the same amount absorbed by 951 trees.

Close-up of rows of solar panel cells

READY WHEN YOU ARE

Let’s build a smarter, more sustainable business.

Tell us what you’re working with and we’ll show you what your site could do.

Get a solar assessment

Pink Renewables

Commercial solar systems for a lower-carbon future.

Find us

Passion House, Excalibur Road, Beacon Park, Gorleston, Norfolk, NR31 7BB, United Kingdom

0800 043 6000 · hello@pinkrenewables.co.uk · Norfolk + UK wide

0800 043 6000 · hello@pinkrenewables.co.uk · Norfolk + UK wide

© 2026 Pink Renewables. Pink Renewables is a trading name of Pink Group Holdings Ltd, registered in England and Wales (company no. 07448391). Registered office: Passion House, Excalibur Road, Gorleston, Norfolk NR31 7BB.

Website built by

Navigate