top of page

Gorleston / United Kingdom

Pink Group Holdings

Pink Group’s recent commercial rooftop installation showcases the transformative impact of solar energy when paired with forward-thinking sustainability goals. By deploying a 43.12 kWp photovoltaic system, we achieved a full return on investment in just three years and are on track to deliver an impressive £174,401 in lifetime energy-cost savings over the next 25 years.

Lifetime Savings: £174,401

Pink3.png

System Overview

This system includes 98 Jinko Tiger Neo 440W N-type all-black mono solar panels, capturing sunlight and converting it into DC electricity. It's paired with SolarEdge 33 kW 3-phase and Fox ESS AC3 10 kW 3-phase inverters to create usable power, and a Fox ESS EP11 10.36kWh Li-ion battery for energy storage and safe grid connection.

Performance Factors

Sunlight intensity is influenced by your location, so we use precise meteorological data to provide accurate performance predictions. While south-facing panels generally receive the most sunlight, east- and west-facing installations also perform well, particularly in diffuse light conditions. Additionally, we take potential shading from nearby trees, buildings, or the surrounding landscape into account to ensure realistic generation estimates.

Pink2.png

explore more case studies

Pink3.png

Pink Group

Gorleston / United Kingdom

£174,401
in lifetime energy-cost savings

Meyer1.jpg

Meyer House

Erith / Kent

£479,261
in lifetime energy-cost savings

Princess1.jpg

Princess Christian

Woking / Surrey

£742,824
in lifetime energy-cost savings

2025 year’s averages (2)_edited_edited_e

Install in progress...

Manufacturer in Great Yarmouth

£238,019
in lifetime energy-cost savings

Hengist1.jpg

Hengistfield

Sittingbourne / Kent

£642,030
in lifetime energy-cost savings

2025 year’s averages (2)_edited_edited_edited.jpg

Install in progress...

Manufacturer in Norwich

£2,237,012
in lifetime energy-cost savings

bottom of page