
Gorleston / United Kingdom
Pink Group Holdings
Pink Group’s recent commercial rooftop installation showcases the transformative impact of solar energy when paired with forward-thinking sustainability goals. By deploying a 43.12 kWp photovoltaic system, we achieved a full return on investment in just three years and are on track to deliver an impressive £174,401 in lifetime energy-cost savings over the next 25 years.
Lifetime Savings: £174,401

System Overview
This system includes 98 Jinko Tiger Neo 440W N-type all-black mono solar panels, capturing sunlight and converting it into DC electricity. It's paired with SolarEdge 33 kW 3-phase and Fox ESS AC3 10 kW 3-phase inverters to create usable power, and a Fox ESS EP11 10.36kWh Li-ion battery for energy storage and safe grid connection.
Performance Factors
Sunlight intensity is influenced by your location, so we use precise meteorological data to provide accurate performance predictions. While south-facing panels generally receive the most sunlight, east- and west-facing installations also perform well, particularly in diffuse light conditions. Additionally, we take potential shading from nearby trees, buildings, or the surrounding landscape into account to ensure realistic generation estimates.

explore more case studies
_edited_edited_e.jpg)





_edited_edited_edited.jpg)